PHOTOVOLTAIC CHECK-UP


HERE ARE SOME OF OUR INSTRUMENTAL MEASUREMENT CAMPAIGNS (DOWNLOAD HERE)



                                                                                                  
 Measurements performed on n.ro 3 plant in Cagliari (CA) for a total power of 53,4 MWp
- I-V curve measurement on a 100% of DC string
- Voc/Isc test on a 100% of DC string
- Digitization of the plant by means of high resolution drone aerial photogrammetry
- Performance testing of centralized inverters with power of 1000 kW each.
- Drone thermography with Radiometric Thermal Orthomosaic reconstruction of the entire photovoltaic plant


        
                                                                                                  
 Measurements performed on plant in Siracusa (SR) for total poer of 13,5 MWp
- I-V curve measurement on a 100% of DC string
- DC string insulation measuremen on 100% strings
- Digitization of the plant by means of high resolution drone aerial photogrammetry
- Geo-referenced survey of the serial numbers of approximately 29,000 photovoltaic modules

        
                                                                                                  
 Measurements performed on a lot of plants in Molise, Abruzzo, Basilicata, Marche and Puglia (Italy) for a total of 33.78 MWp
- I-V curve measurement on a 100% of DC string
- Plant testing PRp% CEI 82-25 standard
- Thermographic analysis of photovoltaic modules, inverters, DC string box and MT Transformer
- On site Electroluminescence with PID analysis (Potential Induced Degradation defect)

          
                                                                                                 
 Measurements performed on a plant composed of: 668 strings of 21 240 Wp photovoltaic modules (total of 14028 modules)
I-V curve measurement on a 100% of DC string
- DC string insulation measurement
- Test and thermography on MT Transformer
- Plant test with PR% measurement by CEI 82-25 standard
Thermographic analysis of photovoltaic modules, inverters and DC string box

          
 
                                                                                                   
 Measurements performed on a plant consisting of: 1329 strings of 20 photovoltaic modules of 235 Wp (26580 modules)
- PID effect analysis (Potential Induced Degradation defect)
I-V curve measurement on a 100% of DC string
DC string insulation measurement
On site Electroluminescence with PID analysis (Potential Induced Degradation defect)
Thermographic analysis of photovoltaic modules, inverters and DC string box

          
  
 Measurements performed on a plant composed of: 213 strings of 21 220 and 225 Wp photovoltaic modules (4473 modules)
- Compliance dichiaration on Italy Law 21 giune 2017, n. 96, art. 57-quater
- Verification of electrical continuity and connection between modules - Check the grounding of masses and unloaders
- Visual inspection of the photovoltaic plant - Verification of the insulation of the electrical circuits from the masses
- Verification of the working current of the strings - Verification of the short-circuit current of the electric circuit from the masses
- Verification of the open circuit voltage of the strings - Verification of insulation - Verification of the correct functioning of the photovoltaic plant



  Measurements performed on a plant composed of: 208 strings of 20 240 Wp photovoltaic modules (4160 modules)
PID effect analysis (Potential Induced Degradation defect)
I-V curve measurement on a 100% of DC string 
- DC string insulation measurement
- I-V curve measurement for a sample of single module
Thermographic analysis of photovoltaic modules, inverters and DC string box 




  Measurements performed on a plant consisting of: 102 strings of 18 240 Wp photovoltaic modules (4122 modules)
- I-V curve measurement on a 100% of DC string   
- DC string insulation measurement
- Plant test with PR% measurement by CEI 82-25 standard on two plant inverter  (n. 2 JEMA x 500 kWp)
- I-V curve measurement for a sample of single module
- Thermographic analysis of photovoltaic modules, inverters and DC string box



  Measurements performed on a plant composed of: 214 strings of 18 240 Wp photovoltaic modules (3852 modules)
I-V curve measurement on a 100% of DC string   
DC string insulation measurement
Plant test with PR% measurement by CEI 82-25 standard on two plant inverter  (n. 2 JEMA x 500 kWp)
- I-V curve measurement for a sample of single module
Thermographic analysis of photovoltaic modules, inverters and DC string box



  Measurements performed on a plant composed of: 195 strings of 20 photovoltaic modules of 235 Wp (3900 modules)
- DC string insulation measurement 
- Plant test with PR% measurement by CEI 82-25 standard on two plant inverter (n. 1 SUNWAY TG 385 e n. 1 SUNWAY TG 610)
- Thermographic analysis of photovoltaic modules, inverters and DC string box
- Check continuity and measurement of the resistance of PE protective conductors


 
  Measurements performed on a plant composed of: 372 strings of 14 photovoltaic modules of 190 Wp (5208 modules)
I-V curve measurement on a 100% of DC string   
DC string insulation measurement
Plant test with PR% measurement by CEI 82-25 standard on two plant inverter  (n. 2 JEMA x 500 kWp)
- I-V curve measurement for a sample of single module
Thermographic analysis of photovoltaic modules, inverters and DC string box